ModRoof Installation — 3 Stages
1) Steel Structure (Design & Erection)
-
Site set-out, code-compliant drawings.
-
Fabrication/coatings, base-plates & anchors, leveling, stiffeners.
-
QC: alignment, weld/torque checks, documentation.
2) Panel Installation (ModRoof Panels)
-
Lifting & fixing of lightweight panels to the frame.
-
Trims/flashings, provisions for skylights/solar; insulation if required.
-
QC: fastener check, joint gaps, drainage paths.
3) Waterproofing & Finishing
-
High-performance membrane (glued + heat-sealed), roof-to-wall interfaces.
-
Sealants, terminations, gutters; leak check and snag close-out.
-
QC: final inspection and handover.​
​
Outcome: a precisely aligned, watertight, skylight/solar-ready roof delivered fast—with documentation and prompt after-service.